1-minute Case Study: Velocity Washer™

Velocity Washer™ reduced customer breakout time on reactors from 18 hours to 20 minutes.
Application: Acrylonitrile reactor. Maximum uptime required to produce acrylonitrile for disposable medical PPE.

18 hours reduction in downtime due to drastically reduced likelihood of stuck / galled nuts.
Replaced their standard washers. 98% less breakout time. Self-performing equals less manpower.
Discovery work: Found 18 hours earlier. No change of produced. No hot work.

Productivity boost: After seeing results, customer installed an additional 965 Velocity Washers™ on critical flanges.

In summary:
– 54x faster
– Discovery work 18 hours sooner
– 20-minute breakout
– Less downtime, standby time, and manpower